View More View Less
  • 1 University of Pécs Pollack Mihály Faculty of Engineering and Information Technology Boszokány u. 2 H-7624 Pécs Hungary
Restricted access

Purchase article

USD  $25.00

Purchase this article

USD  $387.00

Reacting to developments in building technologies of rival reinforced concrete bridges, new methods have appeared in the erection of steel- and composite bridges. A common feature of these methods is the ever-increasing size and mass of structures to be moved in one piece. Moving steel- and composite bridges is more complex than moving concrete structures, since they are more sensitive to temporary influences. This paper discusses experiences in methods of moving large structures, gathered on a number of major river bridges during the last 15 years. The longest of these structures measured 1060 m and the heaviest weighed 8900 tons.

  • Dr. Tóth E. (edit.) Bridges in Borsod-Abaúj-Zemplén County (in Hungarian), Miskolci Közúti Igazgatóság, Miskolc, 1994.

    Tóth E. , '', in Bridges in Borsod-Abaúj-Zemplén County , (1994 ) -.

  • Skoumál G. The Szekszárd Szent-László bridge and its environment (in Hungarian), Építési Évkönyv 2003, Építéstudományi Egyesület, Budapest, 2003, pp. 129–136.

    Skoumál G. , '', in Építési Évkönyv 2003 , (2003 ) -.

  • Szatmári I., Szatmári T., Szatmári G. Launching technology of erecting a steel girder bridge right-bank flood-bridge of the Danube-bridge at Dunaújváros, Proc. 6th International Conference on Bridges Across the Danube 2007, Budapest, 2007, pp. 289–302.

Monthly Content Usage

Abstract Views Full Text Views PDF Downloads
Oct 2020 0 0 0
Nov 2020 2 1 0
Dec 2020 0 0 0
Jan 2021 0 0 0
Feb 2021 0 0 0
Mar 2021 0 0 0
Apr 2021 1 0 0