View More View Less
  • 1 University of Pécs Boszorkány u. 2 H-7624 Pécs Hungary
Restricted access

Purchase article

USD  $25.00

Purchase this article

USD  $387.00

BORSODCHEM is a supplier of chemical raw materials. In 2009, BORSODCHEM ordered a chemical reactor — measuring 4.5 m wide, 4.5 m high and weighing 160 tons — from Japan.The reactor was shipped in one piece from Japan to Rotterdam, then through inland waterways to Bodrogkeresztúr, where it was unloaded.Bodrogkeresztúr is 80 km from Kazincbarcika destination. Load-bearing capacity of 31 bridges along the route had to be verified. Bridges failing verification had to be temporarily supported, ensuring the passage of transport, with no damage to bridges.This article describes the peculiarities of the job.

  • Vigh A. Approximate verification of bridge structures for route permitting (in Hungarian) Doctoral Dissertation, Budapest University of Technology and Economics, Budapest, 2007.

    Vigh A. , '', in Approximate verification of bridge structures for route permitting (in Hungarian) Doctoral Dissertation , (2007 ) -.

  • Vigh A., Kollar L. Routing and permitting techniques of overweight vehicles, J. of Bridges Engineering, Vol. 12, No. 6, 2007, pp. 774–784.

    Kollar L. , 'Routing and permitting techniques of overweight vehicles ' (2007 ) 12 J. of Bridges Engineering : 774 -784.

    • Search Google Scholar
  • Temporary Code for Road Bridges (7685/8/1950 — IX/2. KPM) (in Hungarian), Budapest, 1950.

All Time Past Year Past 30 Days
Abstract Views 6 6 1
Full Text Views 9 6 0
PDF Downloads 0 0 0