. 2445 – 52 . Hill , B.R. 1996 , Streamflow and suspended-sediment loads before and during highway construction, North Halawa
connection with pollutant behavior in soils like highways construction [ 1 ], [ 2 ]. Consequently, the problem of rising water in initially dry soil, which in touch with water at the base and exposed to the atmosphere, should be clarified [ 3 ]. In arid and
szakaszának megelőzőrégészeti feltárása (1992–1999). Előzetes jelentés I (The preceding archaeological excavation of the planning M7 highway in County Somogy (1992–1999). Preliminary report I). SMK 14 (2000) 93
Somogy megyei szakaszának megelőző régészeti feltárása (1992–1999). Előzetes jelentés I (The preceding archaeological excavation of the planing M7 highway in county Somogy (1992–1999). Preliminary report I). SMK 14 (2000) 3
. Major-hegy déli részén, M0 BP 05/2 lh.) — Archaeological investigations in the eastern sector of the M0 highway ring (Budapest XVII, southern part of Major Hill, M0 BP site no. 05/2). Aquincumi füzetek 12. Budapest 2006, 166
Gurrutxaga, M., L. Rubio and S. Saura. 2011. Key connectors in protected forest area networks and the impact of highways: A transnational case study from the Cantabrian Range to the Western Alps (SW Europe). Landscape Urban Plan. 101: 310
1 Introduction 1.1 General In all construction projects the main goal of engineers is to construct a structures, highways, roads etc. able to resist the applied loads and environment conditions. If the soil under structure, which cannot resist, the
side of the highway in a linear pattern, following the direction of the mountains from the northwest to the southeast, quietly rooted in the foothill valley on the other side of the road is the Long River, which runs down the valley. The river width
6 highway in 2006 . AqFüz 13 ( 2007 ) 233 – 273 . Borhy–Bartus et al . 2011 = L. Borhy –D. Bart us– Z. Czajlik – L. Rupnik – E. Számadó : Brigetio (Komárom/Szőny): Fortress – City next to the Danube . In: Romans in the Danube. The
autópálya Somogy megyei szakaszának megelozo régészeti feltárása (2002–2003). Elozetes jelentés III. (The preceding archaeological excavations 2002–2003 of the M7 highway in Somogy county. Preliminary report III) . SMK 16 ( 2004 ) 18 – 23 . Soproni 1956 S